Piper Total Renovation

Piper Total Renovation

Total Renovation in Arnold. We completely renovated and made minor changes to the floor plan. We took space from the kitchen to convert the Master Bathroom from a half bath to a full bath. Also eliminated a closet in the hall bathroom and relocated it to the hall to gain space. We added a French door, refinished all the original hardwood floors, updated both baths and the kitchen.

Bath - Kitchen
BEFORE &AFTER KITCHENKITCHEN AFTERKITCHEN BACKSPLASHBEFORE & AFTER HALL BATHMAIN BATH AFTERAFTER MAIN BATHBEFORE & AFTER MASTER BATHMASTER BATH AFTERMASTER BATH AFTER 2BEFORE & AFTER FRENCH DOORAFTER